Projects
Riverstone Development: 39 Lot Site Development
Work included: clearing and grubbing, mass excavation, excavation and placement of sewer, storm, water, power, and communication lines, hard surface preparation, and hard surface grading. PMECC used GPS modeling and linework technology equipment to complete the work.
Date Completed: 2023
Location: Port Orchard, WA
Little Hill Housing Project: 12 Lot Site Development
Work included constructing civil infrastructure for the Little Hill subdivision in Suquamish, Washington, including clearing and grubbing, mass excavation, site utilities, fine grade, and asphalt/concrete.
Date Completed: 2023
Location: Suquamish, WA
Resurface Charleston Gate and Three Intersections, Naval Base Kitsap Bremerton
Work included: coordinating all traffic and safety revisions including detour routes for vehicles, pedestrians, and truck routes; environmental coordination such as noise, dust, and stormwater protection BPMs; security measures such as gate closures, rerouting pedestrian and vehicular traffic; demolition of large concrete road panels, grinding asphalt, repairing damaged or broken stormwater structures to ensure positive drainage and lane travel; and replacing asphalt and matching existing non-adjustable utility structures, road edges, and creating quality lane travel.
Date Completed: 2022
Location: Bremerton, WA
NW Golf Club Hill Road Phase 2: Stream Restoration, Grading, and Planting
Specific work included the installation of engineered log jams, removal of existing weirs, grading within the stream corridor, and overbank planting. Installed fish nets, fish within the construction zone. Set up bypass pumps to keep creek flowing.
Date Completed: 2021
Location: Chico/Bremerton