Projects

Kitsap Housing Authority

Riverstone Development: 39 Lot Site Development

Work included: clearing and grubbing, mass excavation, excavation and placement of sewer, storm, water, power, and communication lines, hard surface preparation, and hard surface grading. PMECC used GPS modeling and linework technology equipment to complete the work.

Date Completed: 2023

Location: Port Orchard, WA

Suquamish Tribe

Little Hill Housing Project: 12 Lot Site Development

Work included constructing civil infrastructure for the Little Hill subdivision in Suquamish, Washington, including clearing and grubbing, mass excavation, site utilities, fine grade, and asphalt/concrete.

Date Completed: 2023

Location: Suquamish, WA

NAVFAC, Northwest

Resurface Charleston Gate and Three Intersections, Naval Base Kitsap Bremerton

Work included: coordinating all traffic and safety revisions including detour routes for vehicles, pedestrians, and truck routes; environmental coordination such as noise, dust, and stormwater protection BPMs; security measures such as gate closures, rerouting pedestrian and vehicular traffic; demolition of large concrete road panels, grinding asphalt, repairing damaged or broken stormwater structures to ensure positive drainage and lane travel; and replacing asphalt and matching existing non-adjustable utility structures, road edges, and creating quality lane travel.

Date Completed: 2022

Location: Bremerton, WA

Kitsap County

NW Golf Club Hill Road Phase 2: Stream Restoration, Grading, and Planting

Specific work included the installation of engineered log jams, removal of existing weirs, grading within the stream corridor, and overbank planting. Installed fish nets, fish within the construction zone. Set up bypass pumps to keep creek flowing.

Date Completed: 2021

Location: Chico/Bremerton